{"id":15442,"date":"2024-11-08T15:09:22","date_gmt":"2024-11-08T13:09:22","guid":{"rendered":"https:\/\/eoal.org.cy\/?p=15442"},"modified":"2026-04-21T23:32:17","modified_gmt":"2026-04-21T20:32:17","slug":"signing-of-the-construction-contract-agreement-anti-flattening-works-in-the-area-of-kamares-larnaka","status":"publish","type":"post","link":"https:\/\/eoal.org.cy\/en\/signing-of-the-construction-contract-agreement-anti-flattening-works-in-the-area-of-kamares-larnaka\/","title":{"rendered":"SIGNING OF THE CONSTRUCTION CONTRACT AGREEMENT &#8211; ANTI-FLATTENING WORKS IN THE AREA OF KAMARES, LARNAKA"},"content":{"rendered":"<p>\nThe District Local Government Organization of Larnaka (DLGOL) is pleased to announce the presentation and signing of the Construction Contract relating to Tender No. SAL 24\/2023:\n<\/p>\n<p>\n<strong>\u201cFlood Protection Works in the Kamares Area of Larnaka\u201d<\/strong>\n<\/p>\n<p>\nThe Project \u03b1\u03c6\u03bf\u03c1\u03ac the construction of flood protection works in the Kamares area of Larnaka, aiming to safeguard the residential zones of the Municipalities of Larnaka and Aradippou located within the catchment area of the Kalo Chorio River. The Project includes, among others, the following works:\n<\/p>\n<ul>\n<li>\nChannel upstream of Dryadon Street: Demolition of the existing concrete-lined channel and construction of a new open rectangular concrete-lined channel at a lower level, including adaptation of the upstream earthen channel.\n<\/li>\n<li>\nDryadon Street Bridge: Reconstruction of the bridge with a wider and deeper cross-section.\n<\/li>\n<li>\nSection between Dryadon Street and Limassol Avenue (Zik-Zak): Demolition of the existing concrete-lined channel and construction of a new open rectangular concrete-lined channel along a modified alignment and at a lower level.\n<\/li>\n<li>\nConstruction of a new bridge adjacent (to the east) of the existing one at a lower bed level.\n<\/li>\n<li>\nRelocation\/reconstruction of Larisis Street closer to Limassol Avenue and construction of a new bridge.\n<\/li>\n<li>\nConstruction of an open channel between the bridges of Limassol Avenue and Larisis Street.\n<\/li>\n<li>\nRemoval of the embankment\/pedestrian walkway upstream of the Kamares Monument and construction of a pile-supported footbridge to ensure unobstructed river flow.\n<\/li>\n<li>\nShaping of the riverbed at the openings of the Kamares Monument under the supervision and guidance of the Department of Antiquities.\n<\/li>\n<li>\nConstruction of a new cul-de-sac at the end of Ellispontou Street.\n<\/li>\n<\/ul>\n<p>\nThe Project has an execution period of 30 months and, upon completion, will significantly contribute to the flood protection of Larnaka.\n<\/p>\n<p>\nThe presentation and signing of the Agreement will take place on Monday, 18 November 2024, at the Creativity and Culture Centre (former Larnaka Club).\n<\/p>\n<p>\nThe Project is funded by the Republic of Cyprus.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The District Local Government Organization of Larnaka (DLGOL) is pleased to announce the presentation and signing of the Construction Contract relating to Tender No. SAL 24\/2023: \u201cFlood Protection Works in the Kamares Area of Larnaka\u201d The Project \u03b1\u03c6\u03bf\u03c1\u03ac the construction of flood protection works in the Kamares area of Larnaka, aiming to safeguard the residential [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":15443,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[53],"tags":[],"class_list":["post-15442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-genika"],"_links":{"self":[{"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/posts\/15442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/comments?post=15442"}],"version-history":[{"count":1,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/posts\/15442\/revisions"}],"predecessor-version":[{"id":15444,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/posts\/15442\/revisions\/15444"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/media\/15443"}],"wp:attachment":[{"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/media?parent=15442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/categories?post=15442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eoal.org.cy\/en\/wp-json\/wp\/v2\/tags?post=15442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}